Showing all resources
Displaying 21 - 30 of 43 resources
Odds improve (for now) on Las Vegas' water supply
Back in March I wrote about a study showing a 50% chance that climate change would leave "Lake" Mead dry...
Official Launch: In Hot Water
Welcome to International Rivers' climate blog! Our climate team (Barbara Haya, Patrick McCully, Payal Parekh, Ann-Kathrin Schneider and Katy Yan)...
Comments on Changuinola 1 (Chan 75) Large Hydro Project (Panama)
Comments on the CDM Project Design Document (PDD) for the AES Changuinola I (a.k.a. Chan 75) Large Hydroelectric Dam Project:...
Climate Action Network Submission on Developed Country Emission Reductions
A series of discussions are under way among the governments that ratified the Kyoto Protocol on what commitments developed countries...
SANDRP Letter to CDM Executive Board re. Jorethang Loop Review
Proposed Executive Board review of Jorethang Loop CDM application needs to include appraisal, stakeholder consultation requirements Dear CDM Executive Board...
Letter to CDM Executive Board re. Proposed Review of Jorethang Loop Hydro
RE: A review of proposed CDM project–Jorethang Loop–should include whether it met the stakeholder consultation requirements Dear CDM Executive Board...
SANDRP Comments on Tala Major Hydro (Bhutan)
Comments about the proposed CDM credits for Tala Hydroelectric project in Bhutan and export of hydropower to India Based on...
Comments on CDM Project Design Document for Tala Dam, Bhutan
Official CDM project name is “Substitution of grid power generation through transmission of renewable electricity generated in a hydro power...
Comments on Project Design Document for Campos Novos Dam, Brazil
Current Status: Validation Terminated (as of Aug 2009) There are several grounds on which the 880 MW Campos Novos Dam...
UK Government Checklist on WCD Compliance
The UK's Department of Environment (DEFRA) has prepared a checklist which can be used to assess whether a large hydro...