Kunene

Showing all resources

Displaying 11 - 20 of 24 resources

First published on
This resource has been tagged as a Report

Concerns About the Epupa Hydropower Scheme

This speech, by Steve Rothert of International Rivers and in cooperation with Earthlife Namibia, explains a number of concerns about...
First published on
This resource has been tagged as a Report

Epupa Dam and Reservoir Options - A Review of the Aquatic Ecological Aspects of the Draft Feasibility Report

SUMMARY OF COMMENTS The following comments are based on the draft feasibility report, which was made available by Burmeister Partners,...
First published on
This resource has been tagged as a Report

Epupa Dam Feasibility Study Too Poor to Use, Experts Say

The feasibility study for the proposed Epupa Dam in Namibia is so riddled with incorrect conclusions, false assumptions and missing...
First published on
This resource has been tagged as a Report

Review of Chapter 11 of the Feasibility Study for the Epupa Hydropower Scheme, Namibia

Section 11.2.ii states that the simulation “will calculate downstream effects of the” various reservoir discharge scenarios. No further discussion or...
First published on
This resource has been tagged as a Report

A Review of Hydrological Aspects of the Proposed Epupa Dam and Reservoir, Cunene River, Namibia

1. Executive Summary From a hydrologist’s point of view, the Feasibility Study of proposed hydroelectric power dams on the Cunene...
First published on
This resource has been tagged as a Report

A Review of the Epupa Draft Feasibility Study

The author reviewed all sections relating to the project’s economic viability, except for the detailed appendix chapters, which were not...
First published on
This resource has been tagged as a Report

Comments on the Epupa Hydropower Project Feasibility Study

Summary Contrary to assertions in the Feasibility Study, the Epupa hydropower scheme is not the "least cost" power alternative for...
First published on
This resource has been tagged as a Page

Commentary on the Proposed Lower Cunene Hydropower Scheme

Commentary on the Environmental Assessment Report of the Feasibility Study on the Proposed Lower Cunene Hydropower Scheme My comments are...
First published on
This resource has been tagged as a Letter

Letter of Protest to NORAD/Norconsult on Their Role in Epupa Dam

This letter was written by the Society for Threatened Peoples and sent to both Norconsult and NORAD, both of Norway...
First published on
This resource has been tagged as a Letter

To the President of Finland Regarding the Epupa Dam Project

The Epupa Action Committee (Established 27.4.1997) P.O Box 3119 Windhoek, Namibia His Excellency President Martti Ahtisaari Government of Finland Transmission...